Client

Warwickshire Oil Storage Limited

Sector

Utilities

Value

£100,000

Completion Date

March 2015

Duration

6 months

Detail

Scope of Works

Various types of surface preparation and coating works to internal and external tanks gantries  and associated pipe work.  The coating was a three coat paint system – Brantho 3 in 1 Korrux.

Challenges

The work required ICS to continually monitor gas levels. Noise levels (for example from the Vapour Recovery Unit) within the Tank compelled us to utilise state of the art PPE.